Jade Communication

RECENT NEWS

CONTACT US


* Indicates Required Field

/projects-display.cfm

Torrey Pines Institute

Torrey Pines Institute, located in Port St Lucie, is a 104,000 square feet, green-certified building. JCI designed and installed a state-of-the-art, category 6 structured cabling system. The system consists of 1050 category 6 cables distributed to three communication rooms (1 per floor). The communication rooms are linked to the main server room via a 24-strand, 50/125 multi-mode fiber optic cable and a category 3, 100 pair copper cable. The installation was completed by the end of October 2008.

Images