project-details

project-details

Image of the Florida Coast Line

Traditions Medical Center Phase 1 And 2

Traditions Medical Center Phase 1 And 2

Tradition’s Medical Center Phase 1 was the construction of a 5 story hospital building. The cabling system consisted of 3,336 category 6A cables with fiber optic and copper backbone systems distributed to 10 IDF rooms back to the MDF room. Our scope included the installation of all cable tray systems, sleeves, J-hooks, communication cabinets and racks. The entire structured cabling system was tested and certified for a 25 year manufacture warranty with Fluke DTX 1800 testers. Phase 2 is the same as phase 1, category 6A cables with fiber optic and copper backbone systems for the construction of an additional 3 stories on top of phase 1, an attached data center and 2 a story hospital building.

Related Projects

pro

The W Hotel South Beach

The W-Hotel in South Beach consists of 419 luxury condo/hotels with approximately 50,000 square feet..

View Project  
pro

The W Hotel Fort Lauderdale

The W-Hotel in Fort Lauderdale consists of 517 luxury condo/hotels with approximately 100,000 square..

View Project  
pro

Torrey Pines Institute

Torrey Pines Institute, located in Port St Lucie, is a 104,000 square feet, green-certified building..

View Project  
pro

Traditions Medical Center Phase 1 And 2

Tradition’s Medical Center Phase 1 was the construction of a 5 story hospital building. The cablin..

View Project  
pro

The Ballpark Of The Palm Beaches

The Ballpark of the Palm Beaches is a spring training facility for the Washington Nationals and the ..

View Project  
pro

Palm Beach County Convention Center Hilton Hotel

The Palm Beach County Convention Center Hilton consists of 420 luxury rooms with approximately 75,00..

View Project  
pro

Boca West Country Club

JCI has been working for the Boca West Country Club for approximately 28 years. Over the past 28 yea..

View Project  
pro

Martin Health System

Traditions Medical Center Phase 1. Structured cabling system installation of 3,336 category 6A cable..

View Project  
pro

The Morganti Group, Inc.

Palm Beach International Airport Phase 2 Security Upgrades. The installation of a new structured cab..

View Project  
pro

TAMCO Building Products

TAMCO is an in-house manufacturing brand of electrical supplies distributor City Electric Supply. Th..

View Project  
pro

Cleveland Clinic Family Health Center, Stuart

The new Cleveland Clinic Family Health Center in Stuart is an extensive 87,000 square-foot medical f..

View Project  
pro

Rosemary Square

Rosemary Square is an indoor-outdoor mall inclusive of shopping, dining and entertainment establishm..

View Project  
pro

360 Rosemary Square

360 Rosemary Square will be a 20-story, 300,000-square-foot, Class A tower at 360 Rosemary Ave., bet..

View Project  
pro

Cleveland Clinic Florida

Cleveland Clinic Florida, located in Weston, West Palm Beach, Wellington, Palm Beach Gardens, Parkla..

View Project  
All Projects

Subscribe To Our eNewsletter